Sweetwater Revised Preliminary Permit Application

On January 14, 2020 Gridflex Energy, LLC and the Ute Mountain Ute Tribe submitted a revised application to the Federal Energy Regulatory Commission (FERC) for a preliminary permit for a proposed hydroelectric project called the Sweetwater Pumped Storage Project. All but a portion of the project transmission line would be located on tribal lands within the Ute Mountain Ute Reservation. The transmission line would also cross federal lands managed by the Bureau of Land Management. Read the application ›

Read the application

Download the PDF ›

Related Resources

Dragon Bravo Fire Map showing the locations and burn perimeters of the White Sage and Dragon Bravo wildfires in 2025 near Grand Canyon National Park and Kaibab National Forest, with affected areas shaded in orange.
See a map of the areas the Dragon Bravo and White Sage fires burned on the north rim of the Grand Canyon in the summer of 2025, destroying the lodge and numerous other park buildings.
Advocate Magazine cover with image of red packraft on clear blue water in a cave in the Grand Canyon
The fall 2025 edition of the Grand Canyon Trust’s Colorado Plateau Advocate magazine, including a deep dive into the Grand Canyon’s ancient groundwater.
Graphs display Lake Powell and Lake Mead Levels from 2000 to 2023, showing current elevations and distances to power and dead pool thresholds in feet.
How much water is in Lake Powell and Lake Mead? See a live feed of distance above power pool and dead pool at both reservoirs.